23rd March 2018
I didn’t feel too bad this morning, I expected to ache all over, but I was surprisingly agile, and ready for the screed pouring.
I drove to Trowbridge to order the next batch of materials so that they could available for the next phase of the job, plaster-boarding.
When I got to the house, Andy was already cleaning the area ready for the primer to be applied. We were going to do the kitchen area first as that was the deepest.
We brushed on the primer, and waited for it to dry. It was literally watching paint dry. I used the time to bring up five bags of Plaster- board adhesive, which also almost killed me.
The primer was taking a while to dry, so I hit on to the idea of lighting the fire to heat up the room to dry the sealant. Slowly it began to work, so on went a second coat.
One hour later it still didn’t dry, in the end I decided to leave it, I have better things to do than watching the stuff dry.