Day 239 Dob and dab

28th March 2018

So I missed a dental appointment, I had it listed in my phone, with an alarm, but it evaporated into the madness of plasterboard city.

I had set Andy a deadline to get the kitchen area boarded so that the Kitchen people could check the dimensions against the CAD drawings. We stuck the panels on the walls, tapping and kicking them into position.

Linda and Colin from Interior Harmony arrived in the afternoon to check the vital dimensions.

Colin was the fitter, whose job it is to make it perfect, so he meticulously checked everything. Fortunately it all checked out, all that was left was a few changes to the appliances which was planned for tomorrow.

Unknown's avatar

Author: peterb51

I am a practical person, I love making things, and especially working with wood. I appreciate good design, music and food.

Leave a comment