24th April 2018
The task today was to dig out the channel for the LED light. This is positioned in the old fireplace area to provide additional lighting above the new sink. The channel was created by setting two pieces of plasterboard apart so that the lighting extrusion would fit perfectly. We took time to set the panels, but when Andy plastered the panel, he skimmed over everything. I was not concerned because he said he would rake it out. Fast forward to me trying to “rake” this plaster that had dried like a rock. It was a nightmare, it took several hours, and a lot of chipped edges to complete. I was really angry at Andy for cocking it up. If he hadn’t cracked a rib playing rugby I might have had to inflicted the same injury.