25th April 2018
The colour transformation continued. Nicola arrived to help, she is a dab hand at decorating, so with rollers rolling off she went.
The neutral colour, and the feature wall of lemon yellow reflected the light, and it was quite emotional to be at this point in the project.
Andy called in sick, with his cracked rib, and the painkillers did not have much effect, I didn’t expect him to “float” in anyway.
I had contacted Louis to try to get more help with the final boarding of the big wall.
He wrote back saying that he and Andy would be there in the morning.

