Day 2123 Doing the right thing

6th June 2023

So we did get a professional plumber in after all. He did not disconnect everything, instead he fitted shut off valves to the hot and cold supply. This allowed me simply to strip away the parts at the last minute without climbing into the crawl space to turn off the mains supply each time. I waited until the last possible time to do the work ready for the eight o clock start tomorrow.

Kelli finished painting the rocking chair and I finished the arms ready for assembly tomorrow and collection Thursday.

It was a difficult night, Kelli only got four hours sleep, which was not good making the day strained.

The weather was not so hot, making it ideal for outdoor working

Unknown's avatar

Author: peterb51

I am a practical person, I love making things, and especially working with wood. I appreciate good design, music and food.

Leave a comment