7th February 2018
A lot of my thoughts, and emails have been dominated by the work being carried out at my cottage. The changes in the kitchen are causing a few problems to the builder, Louis.
There are some critical dimensions that make the kitchen design work that are difficult to maintain. So sketches were going back and forth, hopefully resolving the situation.
In Holland it is still snowing. I’m moving the projects along governed by the speed by which the adhesive cures.
I got round to taking the bed frame apart that we got on the last trip. It was too big to fit in the truck and had to be lashed to the tailgate and driven back very slowly. The plan was to take it apart to paint and transport to it to the Tin Roof. The posts were held together with square nuts set into a deep recess, of course I could not find a socket to fit, and a conventional spanner was too large to fit in the recess. In the end I ground down one to fit with a belt sander, so Pete the bodger strikes again.