8th May 2018
I was at the tile and flooring store when it opened. I loaded up the tub and set off back to oak floor city.
” this will only take an hour” I said to my self, three hours later I laid the last piece.
The things on my list were many, mostly to do with the bathroom floor. I finished cutting the joists with a lot of half lap joints to cut.
There are days when I can cut the perfect joint, but this wasn’t one of them, it’s not critical, and will never be seen, but I try with each cut to make it good, what a big saddo.