10th May 2018
Colin the installer was there bright and early. Within a short time he was fixing the legs on to the tallest unit, and moved it into position.
There were a few minor adjustments to be made, but he carried on relentlessly until all the units were in position and looking great.

I worked on making a frame to fill a recess in the bathroom where the shower will be sited.

I also had to get rid of a mountain of rubbish that had been building up.
In an organised way I loaded the car with old wood, cardboard and plasterboard in the order that the bins are laid out at the recycling centre. Smugly, I drove off, but the centre was in chaos, apart from the plasterboard, my plan came apart as they had closed the cardboard bin, so I had to adapt a different strategy.
Emptying the cardboard on the ground, I carried the wood towards the bin. An attendant was trying to block it off, but the many people refused to acknowledge him, and continued to dump their rubbish. I joined the rebels, and finished my dumping.
I picked up the remaining bathroom items from Leekes to apply a bit of visual pressure to Andy to make more progress.