Day 293 Fab club news

22nd May 2018

Tiling continued, the aim today was the shower end, and getting all the water pipes in the right place.

My job was to plasterboard the walls, and start on the stud walls of the toilet and utility space. I was absolutely exhausted as the evening closed in, but it was a good day with far more achieved than I thought.

Louise had dinner waiting for me which was a blessing.

Colin the installer arrived to fit the new extractor.

Unknown's avatar

Author: peterb51

I am a practical person, I love making things, and especially working with wood. I appreciate good design, music and food.

Leave a comment