22nd May 2018
Tiling continued, the aim today was the shower end, and getting all the water pipes in the right place.
My job was to plasterboard the walls, and start on the stud walls of the toilet and utility space. I was absolutely exhausted as the evening closed in, but it was a good day with far more achieved than I thought.
Louise had dinner waiting for me which was a blessing.
Colin the installer arrived to fit the new extractor. 