18th November 2021
After months of waiting, my paving slabs were finally delivered. The big truck arrived just as it started snowing. The delivery came on two pallets, one with about ten slabs, the other with close to sixty. That one was almost the limit of the fork lift. I could see it’s back wheel lifting as it came off the truck.
The driver settled both pallets on the driveway close to the rubbish bins, ready for the installation day.
As the snow settled on the delivery, I was looking ahead to a day I could start the laying, but it doesn’t look too promising for the next few weeks.
Still work in the garage was drawing to a climax, five dressers are well on the way to completion, possibly two should be ready for tomorrow, just as well because there is still one in the car and another due for collection tomorrow.
I learnt that the floor standing Anglepoise lamp I ordered a month ago, and was due for delivery on the second of November has been rescheduled for sometime in bloody January.