21st May 2026
The activity across the road at Larry’s old place is reaching fever pitch. The full moon man has been working on it since before I was in the UK.
Recently he has been starting at 7.00am and works until 11.00pm, it must be exhausting.
There are obviously unrealistic deadlines to meet, requiring this extra effort.
It was a sunny day, so I managed to coat the panels of the sofa several times, if it’s still good tomorrow I should have it completed.
I removed the last portion of the old fence, not much salvageable wood in that lot, but suddenly the new area is visible from the sunroom.
I still have the sunroom floor to do, all the maple flooring stares at me every time I open the garage door. I have removed nails from a few planks, but keen to make headway on it I started joining several strips together, this should make the final installation easier.
Kelli was pulling up grass from each side of the shed whilst Chris came over to talk through ideas for some new music. He had reworked the song I said was too similar to another song of his.
This version is a lot better, so I’m looking forward to recording that one.
It seem like a busy day, by dinner time we were both worn out, even the dogs couldn’t stay awake.
One ball that shows the hallmark of her teeth has finally bit the dust, good job I wasn’t holding that one.
